Handling this level of production required high-performance hardware. We installed a 15 kW three-phase Sigenergy inverter, providing the stability and power balancing needed for a large public facility.
The standout feature of this project is the massive energy storage capacity. We installed a stack of six Sigenergy batteries (5 x 9.04 kWh and 1 x 6 kWh), providing over 51 kWh of total storage. This allows the centre to capture every drop of Tipperary sunshine and use it to power evening rehearsals, games, and events, significantly reducing their utility spend and providing a surplus that can be credited back to the centre.